Skip to content
Comparison

Environmental & Physical vs Marketing Collateral

Which you need, what each costs, and when a project wants both — environmental & physical compared with marketing collateral.

Last revised

Both sit under Brand Applications, and clients regularly ask which of the two they actually want. The short answer is below; the rest of this page is how to tell, what each costs, and the cases where a project needs both.

The quick verdict

In short More often than the question implies — the same job frequently touches both, and one team covers them, so moving between them is a conversation rather than a second supplier. If you are not sure which your files need, that is what the free trial is for. The process is the same either way: whichever you pick, the work runs through the same stages and is checked against the same bar. Brand Applications sets that out.

Side by side

Environmental & Physical compared with Marketing Collateral
Environmental & PhysicalMarketing Collateral
Starts atFrom $4,200.00 per projectFrom $4,200.00 per project
Services underneath54

Choose Environmental & Physical if

  • The job is specifically exhibition & stand design, which sits under this one
  • The job is specifically packaging design system, which sits under this one
  • The job is specifically signage & wayfinding, which sits under this one

Choose Marketing Collateral if

  • The job is specifically brochure & catalog design, which sits under this one
  • The job is specifically case study template, which sits under this one
  • The job is specifically one-pager & sell sheet, which sits under this one

What each one is

  • Environmental & Physical The identity applied to physical spaces and objects: signs, exhibition stands, packaging, uniforms and vehicles.
  • Marketing Collateral Brochures, sell sheets, case studies and pitch decks that sales teams use, designed to be edited and reused rather than redesigned each time.

Questions we get on this specific choice

Is one of them cheaper?

They start at the same rate, so the choice is about what the job needs rather than about budget. Complexity moves both.

Which is faster?

Much the same, and volume moves the number far more than the choice between these two does.

Can you tell me which one my files need?

Yes, free. Send two or three real files — that judgment is part of the trial rather than something quoted separately.

Can I switch after we start?

Yes. If the files say the other one is the right answer, we re-quote before doing the work rather than after.

Where to go from here

All services

The work behind this page, and what it costs.

Keep reading